Toll-Free: 1-888-737-3668

Help & Resources

Breaking New Ground – Introducing the C2400 SQUEEZE BOSS

April 30, 2025

The C2400 Squeeze Boss sets a new standard for heavy-wall HDPE squeeze-off tools

Introducing the C2400 Squeeze Boss

At Footage Tools, we’ve spent more than 40 years pushing the boundaries of pipeline innovation. Today, we’re proud to introduce the C2400 SQUEEZE BOSS – the most powerful HDPE squeeze-off tool ever built.

Engineered to handle large-diameter, heavy-wall, High Density Polyethylene (HDPE) pipe, the C2400 is a game-changer for contractors and operators who demand speed, safety, and strength on every job.

The C2400 SQUEEZE BOSS

Figure A: The C2400 SQUEEZE BOSS

With an industry-leading 791 tons of squeeze force (that’s over 1.5 million pounds), this hydraulic tool is the first of its kind to effectively squeeze up to 24″ SDR 7 HDPE pipe – a challenge long discussed in the industry but never realized, until now.

Designed specifically to withstand rigorous field conditions of the Permian Basin, the C2400 tackles one of the biggest challenges in oil and gas infrastructure: minimizing downtime and maximizing operational efficiency in pipeline operations in the toughest environments.

Key benefits and features of the C2400:

  • Unmatched Power: 791 tons (1.5 M+ LBS) of squeeze force
  • Heavy-Wall Pipe: Squeezes HDPE pipe from 16″ to 24″ up to SDR 7
  • Proven Platform: Built on Footage Tools’ trusted framework for large diameter squeeze-off tools
  • Extreme Durability: Designed for rugged job-site performance in extreme field conditions

This isn’t just an evolution – it is a breakthrough in pipeline planning and field operations.

BUILT TO MEET A GROWING INDUSTRY NEED

Footage Tools Family of Hydraulic PE Squeeze-off Tools

Figure B: Footage Tools Family of Hydraulic PE Squeeze-off Tools (4″ through 24″)

For years, operators and contractors asked for a stronger, more reliable squeeze-off tool to meet increasing use of thick-walled HDPE pipe in high-performance applications.

Since 2018, Footage Tools has been a leader in large diameter squeeze-off tools, successfully supporting squeeze-off of HDPE pipe up to 16″. The growing demand for 24″ SDR 7 squeeze-off capabilities led to collaboration with ISCO Industries (ISCO) to bring something new to life.

Together, we engaged with industry stakeholders, gathered insights, and engineered a tool to close the gap and open new possibilities for maintenance and safety in HDPE pipeline systems.

Testing on 24 inch SDR 7 in Midland, Texas

Figure C: Testing on 24″ SDR 7 in Midland, Texas at ISCO Industries

The first C2400 SQUEEZE BOSS tool was tested in late 2024. Full production units will be ready for use in May 2025. This is a tool built for the field and ready to work.

THE FUTURE OF HDPE PIPELINE OPERATIONS

The C2400 SQUEEZE BOSS is more than a tool – it’s a solution to some of the biggest challenges in HDPE pipeline operations: minimizing downtime, reducing costs, and increasing safety during in-stream maintenance.

Designed for versatility across multiple industries, the C2400 is ideal for:

  • Oil and gas
  • Natural gas
  • Water and Wastewater
  • Mining
  • Landfill and Environmental
  • Utility and Infrastructure Contractors

READY FOR THE SQUEEZE BOSS TO TAKE ON YOUR TOUGHEST JOBS?

The most powerful HDPE squeeze-off tool ever built is ready.

Want to learn more? Visit us online, here: C2400 SQUEEZE BOSS.

Want to buy? Contact Us to schedule a discovery call with our team.

Looking to rent? The C2400 SQUEEZE BOSS will be available immediately through our distribution and development partner, ISCO. Book rental here: WWW.ISCO-PIPE.COM/C2400

Recent Posts

Introducing Squeeze-Off Marking Tape

October 5, 2026

Footage Tools is pleased to introduce Squeeze-Off Marking Tape, a simple and highly visible solution designed to identify completed squeeze-off locations on HDPE and MDPE pipe.

When a squeeze-off operation is completed, the location can become difficult to identify over time. A crew performing future maintenance or repair work may have no indication that a section of pipe has previously been squeezed.

Squeeze-Off Marking Tape provides a clear visual reference directly on the pipe, helping future crews recognize where a squeeze-off has occurred and select an appropriate location for future work. The tape easily affixes to HDPE and MDPE pipe and is designed for outdoor and underground applications, providing a durable marker that remains with the pipe long after the squeeze-off operation has been completed.

Perhaps most importantly, the information stays with the pipe. The crew applying the tape today may not be the crew working on that system years from now. By identifying previous squeeze-off locations directly on the pipe, future crews have a clear visual reference that can help support maintenance, repair, and operational activities.

In addition to providing a visible reference in the field, Squeeze-Off Marking Tape can complement utility records and GIS systems by helping ensure information about previous squeeze-off locations remains available to future crews working on the system.

Squeeze-Off Marking Tape is now available through Footage Tools and its distributor network.

To learn more about this valuable new accessory, please click here.

Watermain Emergency Showcases the C2400 Squeeze Boss

July 6, 2026

A 24” HDPE watermain emergency at Texas A&M University demanded a fast, reliable solution. See how the Footage Tools C2400 Squeeze Boss was used by the ISCO Industries team to isolate the pipeline and complete an emergency repair on the university’s domestic water system.

Read the full ISCO Field Report here.